Equipment

Equipment

Recent Projects

Jay-Nart has 10 HDD rigs ranging from 24,000 lbs pullback to 330,000 lbs pullback. We also have a fleet of water trucks and a trenching unit.

HDD Rigs

1.D7x11

  • 7,000 lbs thrust/pullback capability
  • 1100 ft-lbs of rotational torque
  • 50 gpm onboard pump
  • Self contained fluid unit for all climates
  • Compact track mounted rig allows for access to tighter locations

2. D36x50

  • 36,000 lbs thrust/pullback capability
  • 5000 ft-lbs of rotational torque
  • 50 gpm onboard pump
  • Self contained fluid unit for all climates
  • Track mounted rig allows for access to more remote locations

4. D80x100 - 1 UNITS

  • 80,000 lbs thrust / pullback capability
  • 10,000 ft-lbs rotational torque
  • 200 gpm onboard pump
  • Self contained fluid unit for all climates
  • Track mounted rig allows for access to more remote locations

5. D100x140 - 3 UNITS

  • 100,000 lbs thrust / pullback capability
  • 14,000 ft-lbs rotational torque
  • 230gpm gpm onboard pump
  • On board crane
  • 20 foot drill stems
  • Self contained fluid unit for all climates
  • Track mounted rig allows for access to more remote locations

6. D330x500

  • 330,000 lbs thrust / pullback capability
  • 50,000 ft-lbs rotational torque
  • 200gpm - 650 gpm onboard pump
  • Self contained fluid unit for all climates
  • Track mounted rig allows for access to more remote locations

Water Trucks: 5 UNITS

  • Sterling LT 9500
  • Offroad package
  • 105 bbl Hamms tank
  • 3" Bowie enclosed hydraulic pump for use in all climates
  • Sprayer bar
  • 3" and 4" discharge with minimum 60ft of hose
  • 6" dump valve on back

Trenchers: 2 UNITS

1.RT350

  • Up to 48" depth trench
  • Up to 4" pipe
  • Backfill blade

2.RT1250

  • Up to 72" depth trench
  • Up to 6" pipe
  • Backfill blade

Recent Projects

TransMountain (TMEP) Pipeline - 2020

Ongoing. Completed multiple crossings of NPS 36 with various lengths.

Edson area.

Cheecham Corridor Relocation Project - 2020

Line 36 - NPS 10 & Line 37 - NPS 12

Completed multiple crossings of both NPS 10 and NPS 12 with various lengths.

Anzac area.

Wolf Carbon Solutions - ACTL - 2019

Completed multiple crossings of NPS 16 with various lengths.

Central Alberta area.

North Montney Pipeline Project - 2019

Completed multiple crossings of NPS 42. Crossing lengths varied.

Fort St. John area to Chetwynd area in British Columbia .

Enbridge Line 3R Project - 2016 - 2018

Completed multiple crossings of NPS 36 with various lengths of crossings.

Rosetown, Saskatchewan to Winnepeg, Manitoba.

 

Sturgeon County, Strathcona County, Sherwood Park and Beaumont Area Subdivisions Water and Sewer Installation

4” DR11 HDPE and 3” DR11 HDPE
Mainline and services drilled in at engineered and surveyed depths.